Case Type: Processing

Plant Design Validation

Configured a model to dynamically simulate the flow of material, in detail, through the modules for a new lithium plant. The model was designed to identify any systemic issues within the plant layout, specifically within the realm of buffer sizing and equipment utilisation.

In-Shift Production Optimisation

Developed and deployed a solution for a gold miner to use to optimise gold production in the event of unplanned stoppages in the plant. The tool utilises real-time data to determine the optimal set points to run the plant at, factoring in the various operational and metallurgical constraints.